Holiday Maintenance
With the gym shut over Christmas time to catch up on a few jobs while it is quiet. The main item was to change the lamps in the main gym, not an east feat as they are 6.5 m from the floor and over beams, bars and floor. So we hired scaffold and moved the beams, bars and floor! We also emptied the pits, fitted some more powerful hand driers and did some more carpeting around the pit area.
A big thanks to the parents that gave up time during their Christmas break to come in and help.